Monday, December 21, 2020

Passenger Rocker Panel, Door Sill, and Inner Membrane Removal

 



Rocker panel removed, castle rail coming off.

Dogleg panel cut off.
Castle rail half off.

Last part of inner sill hanging by a thread.
 
Deconstruction complete. The floor needs a few patches, and then new parts can start going in. Luckily the driver side does not seem to be this bad, fingers crossed.

Thursday, December 10, 2020

Engine: All the little bits

New thermostat going in. 
New oil pressure relief valve installed, I messed up my PAINT!

Alternator bracket, oil filter adapter, new heater control valve, and reworked distributor installed.

Pretty lifter covers fitted with new seals.


Manifolds installed with new high temperature paint.

And finally, engine mounts. This concludes engine assembly for a while. Carbs will be rebuilt before installation after engine is back in the car. On to body work now.

Head and Rockers!

New head bolts

New head gasket

Old head, ready to go.

Head on, lifters and push rods installed.


Valve rocker assembly installed, head torqued, valves adjusted. This is starting to look like an engine!

 

Oil Pump

New oil pump

Ready for installation

In there

Torqued

Oil pickup screen installed, done.

 

Timing

Timing gear installation

New seal

New chain tensioner

Shiny new paint, timing gears done.

 

Pistons In

 

New rod bearings going in



Oil control ring



Compression rings



Piston #1

Piston #2

All four done