Now that all the sill parts are removed, it is time to repair the floor. The first rusted part cut out, and a patch fashioned from a bit of the old inner rail. |
Patch welded in. The bend in the rail made it easy to form the patch to conform to the floor ribs. |
No comments:
Post a Comment